Webb Core

Modernising space

Webb Core

Sector
Technology
Size
3,500 sq ft
Programme
16 weeks

This Cat A fit-out to a modern office building on the banks of the Clyde river included the installation of a new mineral fibre ceiling installation throughout set within new perimeter margins, redecorations to existing core and external wall elevations, refurbishment of existing core and riser doors, restoration of existing raised access floors, refurbished and reconfigured mechanical air-conditioning and ventilation systems, LED lighting installation, electrical and fire detection systems, total redesign, as well as refurbishment of central core toilet areas.